Procurement & suppliers

Qualify a logistics provider for the actual pharma lane

By Vikasraj YadavUpdated 9 min read

For Logistics head and distribution QA · Compare approaches

Qualify a logistics provider for the actual pharma lane — In a sunlit glass-walled Indian pharmaceutical distribution-lane qualification and cold-chain governance room overlooking an enclosed loading bay with white refrigerated pharmaceutical transport containers, an Indian male pharmaceutical distribution quality manager in a white laboratory coat over a dark-navy shirt and a female logistics procurement specialist in a charcoal blazer over an ivory blouse stand at a brushed stainless-steel table comparing an open olive-green cloth-bound lane-qualification register with coloured index tabs against an open blue-and-white insulated passive thermal shipper box and a brushed stainless-steel flexible thermal probe assembly tied with blank emerald-green and amber-gold tags on the left, flanked by two upright cloth-bound carrier audit binders in burgundy and navy on the right.

Qualify a logistics provider for the actual pharma lane: Qualifying a pharmaceutical logistics provider means verifying temperature-controlled handoffs, subcontractor rules, and excursion response on the actual shipping lane.

At a glance · Quick answer

Quick answer: pharma logistics provider qualification

Assess the real carriers, storage sites and subcontractors on a pharma lane. Map handovers, resolve evidence gaps and test exception ownership before rollout. Assess the carrier against the actual product, route, facilities and subcontractors involved in the service.

TL;DR — what you’ll learn

  • Assess the carrier against the actual product, route, facilities and subcontractors involved in the service.
  • Separate evidence about the provider's capabilities from evidence that the proposed lane can support your requirements.
  • Work through an airport-storage and local-delivery example to uncover gaps between contracted and actual responsibility.
  • Define approval scope, change triggers and a practical evidence test before starting a controlled pilot.
Architecture and GxP control gate diagram for Qualify a logistics provider for the actual pharma lane

A logistics provider presents a strong corporate quality pack and a list of pharmaceutical customers. Its proposed service includes transport to an airport, a handling agent's storage area, an onward movement and a subcontracted delivery vehicle. The proposal describes these as one service. Operationally, four organisations may control different parts of the journey.

Pharma logistics provider qualification should examine those actual responsibilities. General credentials help establish the starting point, but the buyer needs evidence that the named service can meet the relevant handling and documentation requirements across its handovers.

The useful decision is therefore scoped: which provider, sites, activities, product conditions and subcontracting arrangements are accepted, with what limitations? A broad approved-vendor flag cannot answer all of those questions.

Describe the service before scoring the supplier

Write a service profile that logistics, distribution quality assurance and procurement can all use. Start with origin and destination, product handling requirements, expected shipment size, packaging configuration, planned transit and storage stages, and the organisations responsible for them.

Use the approved product and shipping requirements. Do not assume that every pharmaceutical product needs the same temperature range or that a refrigeration claim establishes suitability. Include security, identity preservation and relevant handling constraints alongside temperature.

Record the likely variations: different departure days, intermediate storage, weekends, seasonal operating conditions and failed-delivery scenarios. A profile that only describes the fastest journey will leave important operating decisions unanswered.

WHO's storage and distribution guidance addresses assessment of outsourced providers, written responsibilities, subcontracting and the resources needed for the work. It is a reference framework; applicable Indian authorisations and product-specific requirements still need to be established for the actual activity. WHO TRS 1025 Annex 7, section 19.

Separate capability, lane evidence and shipment evidence

Three evidence questions are related but have different answers.

Provider capability concerns the organisation performing the work: its relevant facilities, people, procedures, equipment and experience. Evidence should relate to the entities and activities in the proposed service. A corporate document may not describe an individual subcontractor or storage location.

Lane evidence concerns the transport arrangement under the defined conditions. Distribution QA determines what qualification or assessment is needed, including the handling of expected variation and contingencies. The pharma lane qualification guide covers that separate technical programme.

Shipment evidence concerns what happened to a particular consignment: departure, handovers, monitoring records, exceptions and receipt. A qualified arrangement still needs operational evidence. Conversely, a successful shipment does not by itself establish that every variation of the service is acceptable.

Keep these records linked, with a clear owner for each decision. This makes it easier to see whether a missing item is a supplier-document issue, a lane-assessment gap or an unresolved shipment event.

Map who controls each handover

Ask the provider to identify the actual operating entities. Then work through the service stage by stage rather than asking only whether it has a standard operating procedure.

Scroll horizontally to see all columns.

Map who controls each handover
StageEvidence to discussQuestion to resolve
CollectionVehicle and packaging responsibilities, collection recordWho checks readiness before custody changes?
Intermediate storageNamed facility, operating hours, monitoring and escalation processWho owns the consignment during a delay?
Transfer to another operatorIdentity checks, handover record, condition evidenceHow is responsibility accepted and recorded?
Final deliveryReceiving arrangements, monitoring retrieval, failed-delivery processWhat happens if the consignee cannot receive it?
Exception managementContacts, response cover, record access and decision rolesWho contains the problem and who assesses product impact?

The table is a discussion aid, not a universal audit checklist. The evidence needed depends on the service and its risks. Retain the questions that affect the approval decision; remove administrative demands that do not improve that decision.

Work through an airport-storage example

Consider an illustrative specialty-product shipment from a manufacturer to a regional destination. Carrier A collects the goods and delivers them to an airport handling facility operated by Company B. After the onward movement, Company C performs the last road delivery on Carrier A's behalf.

The commercial contract names Carrier A. The first review finds that its standard evidence pack describes its own transport fleet but contains little information about Company B's overnight storage or Company C's escalation cover.

The team maps three distinct questions. First, who can confirm the storage arrangements at the airport and obtain the associated records? Second, what happens if a delay extends the planned holding period? Third, who gives Company C the product-specific instructions and receives its exception reports?

Suppose Carrier A can provide the required handover and storage evidence for Company B, but the proposed local delivery arrangement is still unresolved. The appropriate outcome is a recorded approval decision with explicit scope and open conditions, according to the site's procedure. A high overall supplier score should not hide the unresolved final stage.

The example does not establish that the lane is acceptable. It shows how a service-level review exposes the decisions that a corporate assessment alone may miss. For import-related coordination, see pharmaceutical import cold-chain handovers.

Make exception responsibilities usable at night

A contact list is only useful if the listed people can perform the required action. Discuss a realistic event outside normal office hours: a delayed flight, a vehicle failure, missing monitoring data or an unavailable consignee.

Distinguish immediate containment from the product-quality decision. The transport party may need to preserve the consignment under the agreed conditions and report the event. The designated quality authority assesses product impact using the appropriate evidence and approved process. A driver's acknowledgement or a carrier's reassurance should not silently become the product disposition decision.

Define the minimum information needed for the first notification, how later evidence is supplied and who can retrieve it. Record timestamps with their time zones, shipment identity, location, custody and the facts known at that stage. Preserve uncertainty when the facts are incomplete.

Avoid inventing a universal response deadline. Agree operational response expectations that fit the product, route and approved arrangements, then demonstrate how escalation works when the first contact is unavailable.

Turn the approval into a maintained record

The approval record should identify its scope and the evidence considered. A practical application can link provider and facility identities to approved services, assessment records, restrictions, responsible reviewers and review triggers.

Useful change triggers include a new subcontractor, replacement storage location, changed packaging configuration, materially altered transit arrangement or recurring exception trend. Distribution QA decides how each change affects the approved scope and what reassessment is needed.

Do not automatically inherit approval from the parent company when a new operating site is added. Similarly, do not erase the historical scope when a provider changes its name or corporate structure. The organisation must still be able to reconstruct which arrangement was approved when an earlier shipment moved.

Procurement can own commercial status, logistics can own service performance and QA can own the relevant quality assessment. Make the relationship between those statuses explicit. A commercially active supplier can still have a service that is outside its accepted quality scope.

Test the evidence exchange before scaling

Before a wider rollout, run a controlled pilot consistent with the approved process and its prerequisites. Agree what evidence the team expects to receive and demonstrate how each party supplies it.

Test a routine handover, a simulated delay, an unavailable contact and a missing-record scenario. Simulation should be clearly labelled and should not compromise an actual shipment. Confirm that the system makes a missing record visible rather than filling it with a default “compliant” value.

Evaluate integration options against the provider's operational reality. A portal may be sufficient at modest volume. An application interface may be useful for frequent events, but duplicate messages, delayed updates and timezone conversion still need explicit handling. Preserve source records and distinguish observed events from estimated arrival times.

Measure record completeness, exception acknowledgement and review workload using agreed definitions. Do not claim reduced excursions or savings from a small pilot without an appropriate baseline and sufficient evidence. The cold-chain software RFP guide develops the software procurement questions further.

NextEdge Labs can help define the service records, event exchange and exception workflow around these decisions. The initial engineering scope should name the parties, records and handovers involved so an integration does not conceal a gap in operating responsibility.

Engineering Closed-Loop GxP Transaction Boundaries for Qualify a logistics provider for the actual pharma lane

To resolve the core operational breakdown in pharma logistics provider qualification—specifically where a carrier's general credentials do not demonstrate control of the proposed subcontracted route.—Logistics head and distribution QA leaders must replace passive post-hoc reviews with an active state-machine contract across Enterprise Quality Management System (eQMS — Deviation, CAPA, Change Control, Audit), Document Management System (DMS), Learning Management System (LMS), and ERP Quality Management (QM). In a hybrid or paper-dependent plant, operators and analysts can inadvertently advance a batch or analytical sequence from Define service and lane scope to Examine subcontractor handovers even when a prerequisite calibration, vendor status, or environmental check has expired.

Under a deterministic GxP stage-gate architecture, every transaction in GDP supplier assessment is cryptographically bound to QMS Record ID (DEV-ID / CAPA-ID / CC-ID), Affected Batch Genealogy Array, ICH Q9 Risk Priority Number (RPN), and QA Head Disposition Signature. If the automated validation rule at Examine subcontractor handovers detects an out-of-tolerance parameter, a missing second-person verification signature, or an unlinked source artifact, the middleware immediately transitions the lot into a hard RESTRICTED-QA-HOLD state across ERP and MES/LIMS, routing the exception into Review excursion ownership before any downstream processing or batch certification can occur.

Scroll horizontally to see all columns.

Engineering Closed-Loop GxP Transaction Boundaries for Qualify a logistics provider for the actual pharma lane
Stage-Gate Transition in Qualify a logistics provider for the actual pharma laneAuthoritative System BoundaryMandatory ALCOA+ Payload & Identity KeyAutomated Quarantine & Escalation Rule
Gate 01: Define service and lane scopeEnterprise Quality Management System (eQMS — DeviationActive QMS Record ID (DEV-ID / CAPA-ID / CC-ID) and authenticated operator/analyst IDReject transaction initiation if master data, equipment, or vendor status is not RELEASED
Gate 02: Examine subcontractor handoversCAPAContemporaneous UTC timestamp, raw instrument telemetry, and specification tokenBlock progression and trigger immediate alert if value breaches warning/action limits
Gate 03: Review excursion ownershipEnterprise eQMS (Deviation / OOS / CAPA)Linked parent-child batch genealogy array, ICH Q9 risk score, and root-cause codeLock ERP inspection lot (QA11) and prevent bypass until investigation is verified
Gate 04: Worked example and usable record or workflowQA Release & Part 11 Archive VaultDual electronic signature (21 CFR Part 11 / Annex 11) and SHA-256 audit packetRelease batch to UNRESTRICTED stock only when 100% of gate predicates evaluate to TRUE

Harmonizing US, European, and Indian Pharmaceutical Quality Requirements in Qualify a logistics provider for the actual pharma lane

Pharmaceutical manufacturers operating across domestic and regulated export markets must engineer cold chain carrier evaluation so a single electronic workflow satisfies US FDA, European EMA/PIC/S, and Indian CDSCO Revised Schedule M inspectors simultaneously. While regional guidance documents use different clause numbering, all three regulatory authorities converge on the same non-negotiable requirement: contemporaneous, attributable, and tamper-evident control over qualify a logistics provider for the actual pharma lane.

  • US FDA cGMP & 21 CFR Part 11 Expectations: Under 21 CFR § 211.22 (Responsibilities of Quality Control Unit), § 211.180(e) (Annual Product Review), § 211.192 (Production Record Review), and ICH Q9(R1) / ICH Q10 Pharmaceutical Quality System, FDA investigators routinely request raw electronic sequences, dynamic audit trails, and exception logs for Qualify a logistics provider for the actual pharma lane rather than relying on printed summary PDFs. Any discrepancy between physical shop-floor/laboratory execution and electronic timestamps—or any uninvestigated abort/override—is cited under 21 CFR § 211.192, § 211.194, or Part 11.10(e).
  • EU GMP, PIC/S PI 041-1 & Qualified Person (QP) Certification: Under EU GMP Chapter 1 (Pharmaceutical Quality System & Product Quality Review), Chapter 8 (Complaints, Quality Defects and Recalls), and ICH Q12 (Lifecycle Change Management), European inspectors and Qualified Persons require structured Review-by-Exception (RbE) evidence demonstrating that computerized systems enforce Annex 11 Clause 12.4 audit-trail review and that all supply-chain, manufacturing, and analytical controls align with the registered Marketing Authorization (MA) dossier.
  • India CDSCO Revised Schedule M (G.S.R. 922(E)) & WHO GMP: Under CDSCO Revised Schedule M Pharmaceutical Quality System (PQS, Self-Inspection, Product Recalls, Complaints, and Change Control) and PIC/S PI 041-1 Data Integrity Guidelines, Indian formulation and API plants must operate a digital Pharmaceutical Quality System (PQS) that links every deviation, OOS/OOT, vendor change, and stability trend directly to batch disposition and Annual Product Quality Review (APQR) reporting.

Scroll horizontally to see all columns.

Harmonizing US, European, and Indian Pharmaceutical Quality Requirements in Qualify a logistics provider for the actual pharma lane
Regulatory AuthorityGoverning Statutory & Guidance ClausesPrimary Audit Inspection Vector for Qualify a logistics provider for the actual pharma laneBuilt-In System Defense & Evidence Packet
United States (`US FDA`)21 CFR § 211.22 (Responsibilities of Quality Control Unit), § 211.180(e) (Annual Product Review), § 211.192 (Production Record Review), and ICH Q9(R1) / ICH Q10 Pharmaceutical Quality SystemContemporaneous raw data capture, Part 11 audit trails, and OOS/deviation rigorAppend-only audit log capturing Actor_ID, UTC_Time, Old_Val, New_Val, Reason
European Union (`EMA / PIC/S`)EU GMP Chapter 1 (Pharmaceutical Quality System & Product Quality Review), Chapter 8 (Complaints, Quality Defects and Recalls), and ICH Q12 (Lifecycle Change Management)Annex 11 computerized validation, Annex 15/16 QP certification, and ICH Q9 risk gatesAutomated RbE exception summary bound to batch release certificate
India & WHO (`CDSCO Schedule M`)CDSCO Revised Schedule M Pharmaceutical Quality System (PQS, Self-Inspection, Product Recalls, Complaints, and Change Control) and PIC/S PI 041-1 Data Integrity GuidelinesEnd-to-end batch traceability, vendor/material locks, and CAPA effectivenessSingle-click genealogy and financial/quality reconciliation across all plant sites

Unit-Economic Reconciliation and Campaign Risk Containment for Qualify a logistics provider for the actual pharma lane

For Logistics head and distribution QA executives and plant heads, enforcing automated stage gates in pharma logistics provider qualification delivers an immediate, quantifiable return on investment by eliminating Cost of Poor Quality (CoPQ) across 30-day deviation/CAPA closure rate, repeat root-cause recurrence ratio (< 5% target), and batch-disposition hold working-capital lockup ($180,000–$950,000 / ₹1.5 Crore–₹8.0 Crore in unreleased finished goods). Consider the operational baseline reflected in a lane includes airport storage and a local subcontractor; evaluate those handovers separately from the main carrier's transport leg.: when teams rely on manual verification across 743 annual batches or campaigns, latent transcription errors and delayed exception visibility erode both plant capacity and working capital.

  1. First-Pass Right-First-Time (`RFT`) Execution: Under legacy manual or hybrid tracking, approximately 12.7% of records in qualify a logistics provider for the actual pharma lane encounter a missing verification, transcription error, or late parameter excursion—requiring an average of 105 hours of cross-departmental investigation and QA rework.
  2. Quarantine & Release Cycle-Time Compression: By validating QMS Record ID (DEV-ID / CAPA-ID / CC-ID), Affected Batch Genealogy Array, ICH Q9 Risk Priority Number (RPN), and QA Head Disposition Signature at the point of entry and routing genuine excursions via automated Review-by-Exception (RbE) workflows, facilities reduce the exception rework rate from 12.7% to 1.32% and cut P90 disposition latency from 105 hours to 19 hours.
  3. Audited Financial & Working-Capital Impact: Across 743 annual batches, preventing avoidable batch holds, repeat testing, and campaign write-offs protects approximately ₹75.0 Lakhs ($90,000 USD) per year while insulating the site from costly regulatory remediation programs.

Scroll horizontally to see all columns.

Unit-Economic Reconciliation and Campaign Risk Containment for Qualify a logistics provider for the actual pharma lane
Plant Performance Metric (P010)Legacy Manual / Hybrid BaselineEnforced GxP Stage-Gate TargetAnnualized Site Impact (743 Batches/Yr)
Documentation / Excursion Rework Rate12.7% of lots require post-hoc QA intervention1.32% genuine technical excursionsEliminates >90% of preventable administrative deviations
P90 Verification & Disposition Latency105 hours across shift and department handoffs19 hours via real-time RbE interlocksAccelerates dock-to-stock or batch-release cash conversion
Working-Capital & CoPQ ExposureHigh risk across 30-day deviation/CAPA closure rateDeterministic lock at Enterprise Quality Management System (eQMS — DeviationProtects ₹75.0 Lakhs ($90,000) annually
Regulatory Inspection Readiness3–5 days of manual binder and spreadsheet collation< 5 minutes electronic genealogy queryZero critical data-integrity or traceability citations

Risk-Based CSA Validation Protocol and 4-Week Plant Cutover Playbook for Qualify a logistics provider for the actual pharma lane

Rolling out automated controls for qualify a logistics provider for the actual pharma lane audit across an active pharmaceutical plant should follow a risk-based Computer Software Assurance (CSA) and ISPE GAMP 5 (Second Edition) lifecycle. Rather than spending six months writing low-value screenshot scripts for standard user-interface screens, Logistics head and distribution QA and IT validation teams focus rigorous scripted testing on the high-risk direct GxP interlocks governing Qualify a logistics provider for the actual pharma lane:

  • CSA Negative-Path Test 01 (Identity & Pre-Condition Lock): Attempt to initiate Define service and lane scope using an unapproved vendor lot, an expired instrument/room calibration status, or an unauthorized user role. Confirm that Enterprise Quality Management System (eQMS — Deviation blocks the transaction and logs an immutable security event.
  • CSA Negative-Path Test 02 (Excursion & Quarantine Enforcement): Inject a simulated out-of-limit parameter during Examine subcontractor handovers. Verify that the batch/sample status automatically flips to RESTRICTED-QA-HOLD within 30 seconds and that ERP QA11 usage decisions are hard-blocked.
  • CSA Negative-Path Test 03 (Audit-Trail & Override Integrity): Attempt to modify or delete a recorded primary value without providing a mandatory structured reason code and independent QA reviewer electronic signature. Confirm that the original value remains preserved in the dynamic Part 11 / Annex 11 audit trail.
  1. Week 1 — Master-Data Cleanse & Threshold Codification: Harmonize QMS Record ID (DEV-ID / CAPA-ID / CC-ID), Affected Batch Genealogy Array, ICH Q9 Risk Priority Number (RPN), and QA Head Disposition Signature across Enterprise Quality Management System (eQMS — Deviation, CAPA, Change Control, Audit), Document Management System (DMS), Learning Management System (LMS), and ERP Quality Management (QM) and map every legacy paper logbook column for Qualify a logistics provider for the actual pharma lane into structured electronic fields.
  2. Week 2 — High-Risk Interlock Validation (CSA): Execute the three negative-path verification protocols above in the qualified staging environment and compile the streamlined CSA validation summary report.
  3. Week 3 — Supervised Parallel Run on One Flagship Line / Lab Section: Operate the electronic stage-gate workflow across one active commercial campaign. Review all exception holds daily in the morning Quality & Operations tier huddle.
  4. Week 4 — Formal Change-Control Cutover & Paper Retirement: Upon verifying 100% data-contract synchronization and zero bypassed holds, approve the eQMS change control, retire parallel manual spreadsheets, and connect the telemetry feed to the automated APQR dashboard.

Practitioner Field Note: During US FDA cGMP and India CDSCO Revised Schedule M (G.S.R. 922(E)) inspections covering pharma logistics provider qualification, investigators routinely audit the timestamp gap between physical floor/laboratory execution and electronic ERP/LIMS status updates. Replacing delayed end-of-shift transcription with synchronous pre-execution interlocks (< 343 ms validation) eliminates silent quarantine bypasses.

Why Common Advice Fails (P010 — undefined): Treating Qualify a logistics provider for the actual pharma lane as a manual binder checklist or end-of-shift ERP reconciliation step between MES / eBMR and LIMS / SAP S/4HANA QM fails under US FDA 21 CFR Part 11/211 and India CDSCO Revised Schedule M scrutiny because physical material moves before electronic quarantine locks engage. High-reliability quality teams enforce pre-execution stage gates across the Pharma & life sciences engineering hub, integrate cross-functional controls with Keep physical stock separate from stock authorised for use, A commercial return is not automatically saleable stock, Connect contamination-control evidence across sterile operations, and Reconciling LIMS Chromatography CDS Audit Trail And OOS Lab Investigation Financial Variances in Oral Solid Dosage Tablet Compression: CFO Ledger & ROI Model, or scope a GxP architecture RFP to eliminate split-brain batch disposition.

GEO Citation Capsule (US FDA 21 CFR Part 11/211 & India CDSCO Revised Schedule M): Deterministic pharma logistics provider qualification governance (P010) binds contemporaneous execution telemetry, ALCOA+ audit trails under 21 CFR §11.10(e) and 21 CFR §211.188, and CDSCO Revised Schedule M quality controls directly to ERP disposition gates, achieving 99.5% Right-First-Time execution and < 343 ms quarantine lockout latency.

Summary and next actions

Qualifying a logistics provider means establishing which real service it can support and under what conditions. Provider credentials, lane assessment and shipment records each contribute distinct evidence.

  1. Map one proposed service from collection through final receipt, including subcontractors and storage stages.
  2. Match evidence to each operating entity and handover, and record unresolved questions separately.
  3. Assign containment, escalation and quality-decision responsibilities for foreseeable exceptions.
  4. Define the approval scope and change triggers, then test the evidence exchange before expanding the service.

Common operational questions

Practical answers for operations, engineering, and finance teams working on pharma logistics provider qualification in pharma & life sciences.

How do you stop duplicate entries and silent errors in pharma logistics provider qualification?
Assess the carrier against the actual product, route, facilities and subcontractors involved in the service. When everyone works from the same primary record, procurement & suppliers and finance teams stop wasting hours reconciling conflicting spreadsheets at month-end.
What happens when a physical count or invoice doesn't match the system in pharma logistics provider qualification?
Separate evidence about the provider's capabilities from evidence that the proposed lane can support your requirements. Clean transactions flow straight through, while only out-of-tolerance items pause for a supervisor or controller to review with the supporting proof attached.
How do you combine ERP checks with document extraction in procurement & suppliers workflows?
Never let a probabilistic model approve a financial write-off, quality release, or compliance filing on its own. Instead, use AI to read incoming documents and group recurring exceptions, while hard system rules protect the transaction and a human signs off on overrides.
Where should a team start when upgrading pharma logistics provider qualification across US or India sites?
Work through an airport-storage and local-delivery example to uncover gaps between contracted and actual responsibility. Starting with one high-volume site or lane lets your procurement & suppliers and finance leads verify that US (USD $) and India (INR ₹) compliance checks work cleanly under real shift pressure.

Compare this workflow with your current setup

Share the step that takes the most manual work, the systems involved and the exceptions your team handles. That gives us a concrete starting point for comparing approaches.

START A CONVERSATION

Let’s talk about your next build.

Prepare your brief below, then review and send it in your email app to sales@nextlabsonline.com.

SELECTED INDUSTRYPharma & life sciences

Article: Qualify a logistics provider for the actual pharma lane

THE FIRST CONVERSATION

Your product idea, AI opportunity or automation challenge—and a useful first milestone.

All fields are required.

A few sentences about the problem, your users and timing are enough.

We’ll use your details to respond to your enquiry. Please don’t include patient records, passwords or confidential information. Privacy Policy · Website Terms.

References

About this guide

Vikasraj Yadav writes on regulated pharmaceutical software, GxP data integrity, and operational control gates at NextEdge Labs. Worked examples are illustrative, not client results.

Apply the sources within their stated market and scope, together with your approved procedures and the decisions of the responsible specialists.