Logistics & supply chain / Logistics KPIs & Formulas

Line Fill Rate vs Case Fill Rate vs Order Fill Rate

By Vikasraj YadavPublished 8 min read

For supply chain analysts, dc managers and logistics finance controllers · Understand the problem

Line Fill Rate vs Case Fill Rate vs Order Fill Rate — Inventory control lead in a high-visibility vest standing beside a steel warehouse rack holding shrink-wrapped cartons and an amber-taped plastic tote bin, holding a handheld barcode terminal and a ruled clipboard sheet.

Line Fill Rate vs Case Fill Rate vs Order Fill Rate: Illustrative warehouse rack aisle with segregated tote bin, handheld terminal, and clipboard check sheet; not a client facility.

TOFU GuideTopic Pillar: Logistics & Supply Chain · Logistics KPIs & Formulas
Focus topic: line fill rate vs order fill rate
At a glance · Quick answer

Quick answer: line fill rate vs order fill rate

Case fill rate divides cases shipped by cases ordered; line fill rate divides order lines shipped complete by lines ordered; order fill rate divides orders shipped with every line complete by orders received. Run on one 12-line, 5-order dataset, the three give 92.9%, 75.0% and 40.0%, so every published figure must name its unit and denominator.

TL;DR — what you’ll learn

  • On the same 225 ordered cases, 209 shipped gives a 92.9% case fill rate, while 9 of 12 complete lines gives 75.0% and 2 of 5 complete orders gives 40.0%.
  • Order fill rate falls fastest as orders grow: with 75% line fill and 2.4 lines per order, independent shortages would leave only about 50% of orders complete.
  • Value fill rate on identical quantities was 91.1% at US dollar prices and 89.6% at Indian rupee prices because the short SKU carried a different share of value.
  • Measuring against the customer's original order rather than the confirmed quantity moved one retailer scorecard from 97% to 88%, so the denominator must be stated.

Topics: line fill rate vs order fill rate · case fill rate formula · order fill rate calculation · unit fill rate · value fill rate

All quantities, amounts, product codes and events are illustrative teaching examples.

The weekly operations review shows a fill rate of 93%. The key account manager's slide for the same week says 75%, and the customer's own scorecard says 40%. All three are correct. Each counts a different thing: cases, order lines or whole orders. The meeting ends in an argument about whose system is wrong, and nobody fixes the two SKUs that caused the shortages.

Once each rate is pinned to a stated unit, a stated denominator and a named source document, the three figures stop competing and start explaining each other. This guide runs case, line and order fill rate on one small dataset you can check by hand, so the gap between 92.9% and 40.0% becomes a diagnosis rather than a dispute.

  • What the guide covers: the three formulas, a 12-line dataset with every intermediate number, value fill rate in US dollars and Indian rupees, denominator choices and edge cases.
  • What you can reuse: an ownership table for the input fields, a SQL query that returns all three rates from one line table, and a checklist for publishing the definitions.

One shipment, three fill rates: why the numbers never agree

Case fill rate, line fill rate and order fill rate are not three versions of one number. They count shortages at three levels of granularity, so a single missing case weighs very little in the first, one whole line in the second, and one whole order in the third.

  • Case fill rate: cases shipped divided by cases ordered, with shipped capped at ordered on each line. Some teams call it unit fill rate when the unit is the each.
  • Line fill rate: order lines shipped in full divided by order lines ordered. A line short by one case counts as a failed line.
  • Order fill rate: orders with every line shipped in full divided by orders received. One short line fails the whole order.
  • Value fill rate: the value of capped shipped quantity divided by the value ordered, at a stated price list.

The ordering is nearly fixed. Case fill rate is usually the highest, order fill rate the lowest, and line fill rate sits between them. The distance between them tells you how shortages are spread: many small shortfalls across lines, or a few lines cut to zero.

The order-line dataset used for every calculation in this guide

All results below come from one day's outbound orders at an illustrative distribution centre: five orders, twelve lines, six SKUs, all ordered and shipped in cases. The US site prices in dollars and the Indian site prices the same SKUs in rupees from its own price list, not by currency conversion.

Scroll horizontally to see all columns.

Twelve order lines with ordered and shipped cases, and line values at US and Indian price lists (illustrative)
Order and lineSKUCases orderedCases shippedLine completeUSD ordered / shippedINR ordered / shipped
SO-4101 line 1A2020Yes$360.00 / $360.00₹25,000 / ₹25,000
SO-4101 line 2B1010Yes$420.00 / $420.00₹46,000 / ₹46,000
SO-4101 line 3C55Yes$47.50 / $47.50₹3,600 / ₹3,600
SO-4102 line 1A4032No$720.00 / $576.00₹50,000 / ₹40,000
SO-4102 line 2D1212Yes$312.00 / $312.00₹25,200 / ₹25,200
SO-4103 line 1B60No$252.00 / $0.00₹27,600 / ₹0
SO-4103 line 2C1515Yes$142.50 / $142.50₹10,800 / ₹10,800
SO-4103 line 3E88Yes$512.00 / $512.00₹42,400 / ₹42,400
SO-4104 line 1D3030Yes$780.00 / $780.00₹63,000 / ₹63,000
SO-4104 line 2E44Yes$256.00 / $256.00₹21,200 / ₹21,200
SO-4105 line 1A2525Yes$450.00 / $450.00₹31,250 / ₹31,250
SO-4105 line 2F5048No$362.50 / $348.00₹27,000 / ₹25,920
Totals6 SKUs2252099 of 12$4,614.50 / $4,204.00₹3,73,050 / ₹3,34,370

Case prices per SKU are A $18.00 or ₹1,250, B $42.00 or ₹4,600, C $9.50 or ₹720, D $26.00 or ₹2,100, E $64.00 or ₹5,300 and F $7.25 or ₹540. Three lines are short: SO-4102 line 1 by 8 cases, SO-4103 line 1 cut to zero, and SO-4105 line 2 by 2 cases.

From order lines to three fill rates: the measurement pipeline Step 1, Capture: Ordered, confirmed and shipped. 850 or order entry quantity; 855 confirmed quantity; 856 or pick confirm shipped. Step 2, Normalise: One unit and one line key. Convert eaches to cases; Cap shipped at ordered; Link substitutes to lines. Step 3, Calculate: Case, line and order flags. Sum capped cases; Flag lines complete; Flag orders all complete. Step 4, Publish: Rate with its definition. Name unit and denominator; Show cut reasons; Same window for all three. From order lines to three fill rates: the measurement pipeline Each rate uses the same capped line table but counts a different unit in its numerator and denominator 1 · CAPTURE Ordered, confirmed and shipped • 850 or order entry quantity • 855 confirmed quantity • 856 or pick confirm shipped 2 · NORMALISE One unit and one line key • Convert eaches to cases • Cap shipped at ordered • Link substitutes to lines 3 · CALCULATE Case, line and order flags • Sum capped cases • Flag lines complete • Flag orders all complete 4 · PUBLISH Rate with its definition • Name unit and denominator • Show cut reasons • Same window for all three

Case fill rate: counting units shipped against units ordered

Case fill rate on this dataset is 209 ÷ 225 = 92.9%. It answers a supply question: what share of the volume customers asked for left the building. It is the right measure for inventory availability and labour planning, and the weakest one for customer experience.

The calculation looks trivial, but two rules decide whether it is trustworthy. Shipped quantity must be capped at ordered quantity on each line before summing, and every line must be in the same unit. Without the cap, ten extra cases of SKU D on one order would offset eight missing cases of SKU A on another and report a healthier number than the customers saw.

Case fill rate for a distribution centre equals capped cases shipped on the X12 856 ship notice or WMS pick confirmation divided by cases ordered on the X12 850 purchase order; on the twelve-line sample, 209 of 225 cases gives 92.9%, within 0.1 percentage point of a manual recount.

Unit of measure is the other trap. If SKU F is sold in cases of 12 but a customer orders 30 eaches, the line is 2.5 cases. GS1 assigns separate GTINs to each packaging level, so the order line and the pick confirmation can legitimately carry different identifiers for the same product. Convert both to one base unit, using the item master's pack hierarchy, before the line enters the calculation.

Line fill rate: when a line counts as filled and when it does not

Line fill rate on the dataset is 9 ÷ 12 = 75.0%. A line counts as filled only when capped shipped quantity equals ordered quantity, so SO-4105 line 2, shipped 48 of 50 cases, fails exactly as badly as SO-4103 line 1, shipped 0 of 6.

That binary rule is deliberate. A store replenishment buyer experiences a short line as a gap on the shelf or a follow-up order, regardless of how many cases arrived. Some teams soften it into "average line completeness", the mean of shipped ÷ ordered per line, which on this data is (9 + 0.80 + 0 + 0.96) ÷ 12 = 89.7%. That is a different measure and should carry a different name.

  • Tolerance band: if contracts allow a short ship within, say, 2% of ordered quantity, record the tolerance on the line and publish the rate both with and without it.
  • Split lines: when a WMS splits one order line into several pick tasks, roll them back to the customer's line number before counting, or one line becomes three.
  • Zero-quantity lines: lines the customer cancelled before release leave both numerator and denominator; lines cut by the supplier stay in the denominator.

Order fill rate and why it falls fastest as orders get longer

Order fill rate on the dataset is 2 ÷ 5 = 40.0%: only SO-4101 and SO-4104 shipped every line in full. Three short lines, one in each of three different orders, failed three of five orders.

A quick model shows why order fill rate punishes long orders. If each line failed independently with the same probability, the chance an order is complete would be the line fill rate raised to the number of lines. With 75% line fill and an average of 12 ÷ 5 = 2.4 lines per order, that gives 0.752.4 ≈ 50%.

-- All three fill rates from one capped order-line table
WITH line AS (
  SELECT order_id,
         line_no,
         ordered_cases,
         LEAST(shipped_cases, ordered_cases)              AS shipped_capped,
         CASE WHEN shipped_cases >= ordered_cases
              THEN 1 ELSE 0 END                            AS line_complete
  FROM   order_line_fact
  WHERE  ship_window = DATE '2026-11-10'
    AND  line_status <> 'CUSTOMER_CANCELLED'   -- supplier cuts stay in
),
ord AS (
  SELECT order_id, MIN(line_complete) AS order_complete
  FROM   line
  GROUP  BY order_id
)
SELECT ROUND(100.0 * SUM(shipped_capped) / SUM(ordered_cases), 1) AS case_fill_pct,   -- 92.9
       ROUND(100.0 * AVG(line_complete), 1)                       AS line_fill_pct,   -- 75.0
       (SELECT ROUND(100.0 * AVG(order_complete), 1) FROM ord)    AS order_fill_pct   -- 40.0
FROM   line;

-- Independence check:  expected_order_fill = line_fill ^ (lines / orders)
--                      0.75 ^ (12 / 5) = 0.501

The actual 40% is below the model's 50% because the shortages were spread one per order rather than clustered. Had all three short lines sat in one order, order fill would have been 4 ÷ 5 = 80% with the same line fill. When order fill runs well below the independence estimate, the allocation logic is spreading scarce stock thinly; when it runs well above, shortages are concentrated in a few orders.

Value fill rate in dollars and rupees on the same twelve lines

Value fill rate weights each short case by its price, so it tracks revenue left on the table. On the dataset it is $4,204.00 ÷ $4,614.50 = 91.1% at the US price list and ₹3,34,370 ÷ ₹3,73,050 = 89.6% at the Indian price list, with identical quantities.

The gap comes from price mix. The six cases of SKU B cut on SO-4103 are 5.5% of ordered value in dollars ($252 ÷ $4,614.50) but 7.4% in rupees (₹27,600 ÷ ₹3,73,050), because SKU B is priced relatively higher on the Indian list. The same physical cut therefore costs more value fill at the Indian site. Neither market has a statutory definition of fill rate; the dual-market difference is entirely commercial.

Scroll horizontally to see all columns.

The four rates side by side on the twelve-line dataset, with what each one is used for
MeasureNumeratorDenominatorResultTypical audience
Case fill rate209 capped cases shipped225 cases ordered92.9%Inventory planning, DC labour planning
Line fill rate9 complete lines12 lines ordered75.0%Retail and distributor customer service
Order fill rate2 complete orders5 orders received40.0%Project, kit and e-commerce customers
Value fill rate, US price list$4,204.00 shipped$4,614.50 ordered91.1%Sales and finance, US entity
Value fill rate, Indian price list₹3,34,370 shipped₹3,73,050 ordered89.6%Sales and finance, India entity

Value fill rate in an ERP sales ledger weights capped shipped cases by the active price list; on identical twelve-line quantities, the US price list gives 91.1% and the Indian price list 89.6%, a 1.5-point spread caused by the six cut cases of SKU B carrying 5.5% of dollar value but 7.4% of rupee value.

Value fill rate also sits closest to finance. Short-shipped value is revenue deferred or lost, and in a 3PL it may also be handling revenue not earned. For how fulfilment activity turns into cost per order, see our guide to warehouse cost per order.

Denominators that change the answer: original, confirmed or revised

The quantity in the denominator must be named, because suppliers and customers routinely use different ones. The customer's purchase order, the supplier's acknowledgment and the customer's own later change can all carry different quantities for the same line.

  • Original ordered quantity: as received on the X12 850 purchase order or keyed from a PDF or portal order. Most retailer scorecards use this.
  • Confirmed quantity: as sent back on the X12 855 acknowledgment after allocation. Suppliers prefer it because it excludes cuts announced in advance.
  • Revised quantity: after a customer-initiated change. Customer reductions should lower the denominator; supplier-initiated reductions should not.
  • First-pass versus final: first-pass fill counts only the first shipment; final fill includes backorders shipped later within an agreed window.

The trace below is a composite from a consumer goods supplier, with identifiers changed. It shows how one denominator choice moved a monthly scorecard by nine points and nearly triggered a penalty discussion.

  1. 03 Oct 2026, 06:10: retailer purchase order PO 7781204 arrives on an 850 for 1,000 cases across 40 lines.
  2. 03 Oct 2026, 09:45: allocation cuts SKU 30155 by 93 cases; the 855 acknowledgment confirms 907 cases.
  3. 05 Oct 2026, 14:20: the DC ships 880 cases, 27 short on picking; the 856 ship notice lists 880.
  4. 04 Nov 2026, 08:00: the supplier dashboard reports case fill of 880 ÷ 907 = 97.0% against confirmed quantity.
  5. 06 Nov 2026, 11:30: the retailer scorecard reports 880 ÷ 1,000 = 88.0% against the original order; both teams agree to publish both figures, labelled, from December.

Fill rate measured against the X12 855 confirmed quantity excludes supplier cuts announced before shipping; on purchase order 7781204, 880 shipped cases scored 97.0% against 907 confirmed but 88.0% against the 1,000 cases on the original 850, a nine-point gap from the denominator alone.

Edge cases: substitutions, over-ships, pack-size changes and cuts

Write the edge-case rules down before the first report goes out. Every one of them changes a numerator or denominator, and each is easier to settle in a definition document than in a monthly review meeting.

Scroll horizontally to see all columns.

Which fill rate rules a system should apply automatically and where software only helps an analyst
TaskFixed rule in the calculationWhere software or AI assists an analystWho approves the rule
Capping over-shipped linesShipped quantity limited to ordered quantity per lineReport over-ships separately with valueSupply chain analytics lead
Converting eaches, inners and casesConvert to one base unit from the item master pack hierarchyFlag lines where order and pick units disagreeMaster data owner
Classifying cut reasons from picker notesEvery short line must carry a coded reasonSuggest a reason code from free-text picker comments for a supervisor to acceptDC operations manager
Matching a substitute SKU to the original lineCounts as filled only with a pre-approved substitution recordPropose likely substitute links from item attributesCustomer service manager
Excluding customer cancellationsCustomer-initiated changes reduce the denominator; supplier cuts do notRead change requests to propose who initiated the changeCustomer service manager
Choosing the measurement windowAll three rates use the same ship or order date windowNone; set once in the definitionSupply chain analytics lead

Choosing which fill rate to publish to each audience

Publish the rate that matches the decision each audience makes, and always show its definition next to the number. Operations steer on case fill, customer teams on line or order fill, and finance on value fill; nobody should see one of them unlabelled.

Our TMS evaluation built around one difficult transport order follows a single order's partial delivery through planning and billing. This guide steps back from one order to the population of orders, where the question is not how a partial shipment is executed but how often it happens and how it is counted. For wider KPI field definitions, see the supply chain KPI data dictionary.

Scroll horizontally to see all columns.

Who owns each input to the fill rate calculation and who signs off the published definition
Input or decisionSource recordData ownerSign-off
Ordered quantity and unitX12 850 or order entry in the order management systemCustomer serviceCustomer service manager
Confirmed quantity after allocationX12 855 acknowledgment or allocation logDemand and allocation planningSupply planning manager
Shipped quantityWMS pick confirmation and X12 856 ship noticeDC operationsDC manager
Cut reason code per short lineWMS short-pick recordDC operationsDC manager
Price list for value fillERP pricing condition recordsSales operationsLogistics finance controller
Published definition and windowKPI definition documentSupply chain analyticsHead of supply chain

Before go-live, run the checklist below against one week of real orders and reconcile the results by hand, as the twelve-line example does. If the hand count and the dashboard differ by more than 0.1 percentage point, fix the pipeline before anyone uses the number in a customer review.

Scroll horizontally to see all columns.

Checklist for putting the three fill rate definitions into a reporting pipeline
CheckWhat good looks likeTest
Unit and denominator in the metric name"Line fill, original order, first pass"No dashboard tile shows an unlabelled fill rate
Over-ship cappingShipped never exceeds ordered per lineA test order with ten extra cases leaves case fill unchanged
Unit conversionAll lines in one base unitAn each-ordered line converts to the correct fraction of a case
Cut reasonsEvery short line has a reason codeLess than 2% of short lines coded "other"
ReconciliationThree rates rebuilt by hand from a sampleHand count within 0.1 point of the dashboard

The full library of logistics and supply chain guides covers the allocation, picking and carrier steps that move these numbers. If you are scoping a KPI pipeline that joins order, allocation and WMS data with agreed definitions, describe your order volumes and source systems in a request for proposal.

Discuss this workflow

Describe your current systems, the recurring exception and the outcome you need. Keep shipment, customer and financial records out of the initial message.

START A CONVERSATION

Let’s talk about your next build.

Prepare your brief below, then review and send it in your email app to sales@nextlabsonline.com.

SELECTED INDUSTRYLogistics & supply chain

Article: Line Fill Rate vs Case Fill Rate vs Order Fill Rate · Logistics KPIs & Formulas

THE FIRST CONVERSATION

Your product idea, AI opportunity or automation challenge—and a useful first milestone.

All fields are required.

A few sentences about the problem, your users and timing are enough.

We’ll use your details to respond to your enquiry. Please don’t include patient records, passwords or confidential information. Privacy Policy · Website Terms.

Common operational questions

Practical answers for operations, engineering, and finance teams working on line fill rate vs order fill rate in logistics & supply chain.

Which fill rate should a distribution centre report to customers?
Report the one that matches how the customer feels the failure. A retailer replenishing shelves notices missing lines, so line fill rate suits it; a project buyer who needs every item to start work feels order fill rate. Case fill rate suits internal capacity and inventory reviews more than customer service.
Should over-shipped quantities raise the fill rate?
No. Cap shipped quantity at the ordered quantity on each line before summing, otherwise extra cases on one line hide shortages on another. Over-shipments are a separate accuracy problem and often lead to refusals or returns, so track them in their own measure instead of netting them inside fill rate.
Do substitutions count as filled lines?
Only if the customer agreed to the substitute in advance, for example through an approved substitution list. Otherwise the original line is short and the substitute is a new line the customer did not order. Record the substitution link so analysts can report fill rate with and without approved substitutes.
Is fill rate the same as OTIF or perfect order rate?
No. Fill rate measures quantity completeness only. OTIF adds a delivery-time test, and perfect order rate adds further conditions such as damage-free delivery and correct documents. A shipment can be fully filled yet late, so it passes fill rate and fails OTIF on the same order.

References

Sources checked 13 November 2026. US and India statutory authorities and vendor documentation support platform facts; the worked examples and diagrams are original.

About the author

Vikasraj Yadav writes about operational decisions, software and automation for NextEdge Labs.