Logistics & supply chain / Shipping & Trade Documents

Delivery Challan Under GST Rule 55: When You Need One

By Vikasraj YadavPublished 9 min read

For export-import, customs and transport documentation managers · Understand the problem

Delivery Challan Under GST Rule 55: When You Need One — Three trade-compliance staff around a wooden table reviewing a blank ruled sheet beside two burgundy binders, a steel flange sample, a blank ruled clipboard and a blurred laptop.

Delivery Challan Under GST Rule 55: When You Need One: Illustrative customs query response and technical evidence review.

At a glance · Quick answer

Quick answer: delivery challan gst rule 55

CGST Rule 55 allows a delivery challan instead of a tax invoice when goods move before a sale exists: job work, liquid gas of unknown quantity, non-supply moves such as approval sales, line sales and exhibitions, and later knocked-down lots. The challan needs a serial of up to 16 characters, nine particulars and, where Rule 138 applies, an e-way bill.

TL;DR — what you’ll learn

  • Rule 55(1) permits a challan in four cases only; a move between two GSTINs of the same company is a supply under Schedule I and needs a tax invoice.
  • Every challan needs a serial of at most 16 characters and nine particulars, including HSN, taxable value and place of supply for inter-State moves.
  • Inter-State job-work movements need an e-way bill at any value under the Rule 138(1) proviso; other challan moves follow the ₹50,000 consignment threshold.
  • Job-work inputs must return within one year and capital goods within three; approval goods must be invoiced within six months of removal under Section 31(7).

Topics: delivery challan gst rule 55 · job work delivery challan · delivery challan for goods sent on approval · line sales delivery challan · delivery challan e-way bill

All quantities, amounts, product codes and events are illustrative teaching examples.

A truck leaves a Pune plant at 6 p.m. with 1,200 machined blanks for a heat-treatment shop in Vapi. Stores printed a "challan" from a spreadsheet, nobody raised an e-way bill because "it is not a sale", and the officer at the Gujarat border sees an inter-State job-work movement with no e-way bill at all. The goods sit for two days while the plant learns that the paper it trusted was missing half of what the rules ask for.

The delivery challan is a short document with a long tail. Issued correctly under Rule 55 of the Central Goods and Services Tax Rules, 2017, it lets goods travel lawfully before any sale exists, keeps tax out of the picture until a supply happens, and gives the tax team a numbered trail to close later. Issued loosely, it becomes the weakest page in the cab.

  • What this guide covers: the four situations Rule 55 permits, the nine particulars, job-work endorsements and return deadlines, approval and line sales, staged shipments, and pairing with the e-way bill.
  • What it adds: a worked job-work cycle in rupees, a US contrast on title and risk in dollars, a register query that finds overdue challans, and a rollout checklist.

Four movements Rule 55 lets you send without a tax invoice

Rule 55(1) allows a delivery challan in place of an invoice in four cases, and only those four. If the movement is a completed supply to a known buyer at a known price, it needs a tax invoice, whatever the dispatch desk prefers to print.

The rule lists them in clauses (a) to (d): liquid gas where the quantity at removal is not known; goods sent for job work; goods moved for reasons other than by way of supply; and other supplies the Board notifies. The third clause carries most of the traffic, because it covers branch moves within one registration, goods taken out on approval, line sales from a van and exhibition stock.

Scroll horizontally to see all columns.

Movements that qualify for a delivery challan, with the document that later closes each one
MovementRule 55 clauseTypical exampleDocument that closes the movement
Liquid gas, quantity unknown at removal55(1)(a)Bulk industrial gas filled into a customer tank, metered on siteTax invoice after the delivered quantity is known, under Rule 55(4)
Inputs or capital goods to a job worker55(1)(b)Castings sent for machining or platingReturn challan or endorsement; deemed supply if the Section 143 period lapses
Goods taken on approval or for line sales55(1)(c), read with 55(4)Jewellery shown to buyers in another State; a distributor van selling route by routeTax invoice raised when each sale happens; unsold stock returns on the same challan trail
Own-use and exhibition moves within one GSTIN55(1)(c)Display stock to a trade fair, tools to a project siteReturn entry against the original challan
Later lots of a knocked-down or batched supply55(5)A press line shipped in six trucksThe full invoice issued before the first truck; original travels with the last lot

Nine particulars a challan must carry and the 16-character number

A compliant challan is defined by Rule 55(1) itself: a serial number of at most sixteen characters, in one or more series, plus nine listed particulars. Anything missing from the list is a gap an officer can point to, and a gap your own reconciliation will trip over months later.

  1. Date and number: the date of the challan and its serial number, unique within the series.
  2. Consignor details: name, address and GSTIN of the consigner, if registered.
  3. Consignee details: name, address and GSTIN or Unique Identity Number of the consignee, if registered.
  4. Goods description: HSN code and a description that matches what is physically loaded.
  5. Quantity: actual quantity, or provisional quantity where the exact figure is not known at removal.
  6. Taxable value: a value is required even though no tax is charged on a non-supply movement.
  7. Tax rate and amount: central, State, integrated or Union territory tax and cess, only where the movement is for supply to the consignee.
  8. Place of supply: required for inter-State movement.
  9. Signature: of the consigner or an authorised person.

Rule 55(2) adds the copy discipline for movements that are supplies: the original is marked for the consignee, the duplicate for the transporter and the triplicate for the consigner. Many plants print three copies for every challan regardless, which costs little and removes a decision from the loading bay.

Delivery challans issued under CGST Rule 55(1) must carry a serial number of no more than sixteen characters and nine particulars, including HSN code, taxable value and, for inter-State movement, place of supply; the challan register in the ERP should reject any print where one of those nine fields is blank.

The value field causes the most arguments. Stores teams ask why a value is needed when no tax is paid. The answer is practical as well as legal: the value drives whether an e-way bill is required, it is the figure at which a deemed supply is taxed if job-work goods never return, and it is what the insurer will ask for if the truck is lost.

Job work challans: Rule 45 endorsements and the one-year return clock

For job work, the challan is the start of a clock, not just a transport document. Section 143 of the CGST Act lets a principal send inputs or capital goods to a job worker without paying tax, but only if they come back or are supplied onward within fixed periods.

Inputs must return within one year and capital goods within three years of being sent out. Moulds and dies, jigs and fixtures, and tools are carved out of those deadlines. The Commissioner can extend the periods by up to one more year for inputs and two more for capital goods on sufficient cause. If the deadline passes, Section 143(3) and (4) treat the goods as supplied on the day they were first sent out.

  • Who issues it: Rule 45(1) puts the challan in the principal's name, including where goods go directly from a supplier to the job worker.
  • Onward to a second job worker: the challan may be issued by the principal or by the job worker sending the goods on.
  • Endorsement on the way back: the job worker may endorse the principal's challan with the quantity and description being returned or forwarded, and a later job worker may endorse it again.
  • Return to the tax system: Rule 45(3) requires challan details in FORM GST ITC-04, half-yearly for principals with aggregate turnover above ₹5 crore in the previous year and annually for others, by the 25th of the following month.
  • Scrap: under Section 143(5), waste and scrap from the job may be supplied by a registered job worker directly on payment of tax.

Goods on approval and line sales: invoice at the point the sale happens

When goods leave before anyone knows which of them will be sold, the challan carries them and the invoice follows the sale. CBIC Circular No. 10/10/2017-GST of 18 October 2017 says so directly, by reading Rule 55(1)(c) and Rule 55(4) together.

The circular was written for jewellers who carry stock to buyers in other States, but its paragraph 5 applies the same reading to all goods supplied in similar situations. That covers a van that loads 400 cartons in the morning and sells to whichever retailers place orders on the route. The salesperson can carry an invoice book and raise each invoice once the sale is made.

  • Inter-State approval sales: paragraph 4 of the circular treats a sale made in a State other than the supplier's as an inter-State supply, so integrated tax applies.
  • Outer time limit: Section 31(7) of the CGST Act requires the invoice before or at the time of supply, or six months from removal, whichever is earlier.
  • Unsold stock: cartons that come back are received against the outbound challan, so the opening load, invoices raised and returns reconcile to zero.
  • E-way bill reason: the notified FORM GST EWB-01 lists "Line Sales" and "Recipient not known" among the reasons for transportation, which is how the portal records these movements.

The six-month limit in Section 31(7) is the control most teams miss. A demonstration unit left with a prospect "until they decide" becomes a supply by operation of law on day 183 if it is still there, and the invoice is then overdue rather than optional.

Batches and knocked-down units: one invoice, many numbered challans

Large equipment that cannot travel in one vehicle uses a hybrid: the invoice goes first, and each truck carries a challan that points back to it. Rule 55(5) sets the sequence, and it applies to goods sent in semi knocked down or completely knocked down condition, or in batches or lots.

The supplier issues the complete invoice before the first consignment leaves. Each subsequent consignment travels on its own delivery challan referencing that invoice, with a certified copy of the invoice. The original invoice travels with the last consignment. The e-way bill portal's own FAQ applies the same logic when one invoice moves in several vehicles: one e-way bill per vehicle, generated from that vehicle's challan.

Knocked-down shipments under CGST Rule 55(5) follow a fixed order: complete tax invoice before the first truck, one delivery challan per later truck citing that invoice, and the original invoice on the final truck; the dispatch plan should hold the last vehicle until every earlier challan shows a delivered status.

Sequence errors are the usual failure. If the original invoice rides on truck 2 of 6 because it was "ready", the consignee receives the original before most of the goods, and the last truck travels with only a certified copy. Build the lot plan in the dispatch system so the original's print is released only against the final lot number.

Pairing the challan with an e-way bill under Rule 138 and Rule 138A

A challan and an e-way bill are partners, not alternatives. Rule 55(3) says goods moving on a challan must be declared under Rule 138, and Rule 138A(1) requires the person in charge of the conveyance to carry the challan and the e-way bill or its number.

The general trigger is consignment value above ₹50,000, measured on the value in the invoice, bill of supply or challan. Two provisos remove the threshold entirely. Inter-State job-work movements need an e-way bill irrespective of value, generated by the principal or by a registered job worker. Inter-State handicraft movements by persons exempt from registration also need one at any value.

Delivery challan under Rule 55: from movement decision to a closed register line Step 1, Classify: Supply, job work or non-supply move. Inter-GSTIN moves need an invoice; Job work under Rule 55(1)(b); Approval and van stock under 55(1)(c). Step 2, Issue challan: Serial and nine particulars. Serial of 16 characters or less; HSN, value, place of supply; Three marked copies. Step 3, Pair e-way bill: Part A from challan, Part B for truck. Job work across States: any value; Others above ₹50,000; Challan and EWB in the cab. Step 4, Close the line: Return, invoice or deemed supply. Endorsed return matched to line; Invoice approval goods by month 6; Inputs back within one year. Delivery challan under Rule 55: from movement decision to a closed register line Decide the clause, print the nine particulars, pair the e-way bill, then close every line by return, invoice or scrap 1 · CLASSIFY Supply, job work or non-supply move • Inter-GSTIN moves need an invoice • Job work under Rule 55(1)(b) • Approval and van stock under 55(1)(c) 2 · ISSUE CHALLAN Serial and nine particulars • Serial of 16 characters or less • HSN, value, place of supply • Three marked copies 3 · PAIR E-WAY BILL Part A from challan, Part B for truck • Job work across States: any value • Others above ₹50,000 • Challan and EWB in the cab 4 · CLOSE THE LINE Return, invoice or deemed supply • Endorsed return matched to line • Invoice approval goods by month 6 • Inputs back within one year
  • Part A from the challan: the document type is the challan, the document number is its serial, and the reason for transportation is chosen from the notified list, such as job work, SKD or CKD, line sales or exhibition or fairs.
  • Part B for the vehicle: under Rule 138(2), a consignor moving goods in its own or hired road vehicle completes Part B; otherwise the transporter does.
  • Weighbridge exemption: Rule 138(14)(n) waives the e-way bill for trips up to 20 km to a weighbridge and back, but only if a Rule 55 challan accompanies the goods.
  • Cancellation window: Rule 138(9) allows cancellation within 24 hours of generation if the goods do not move as declared, unless the e-way bill was verified in transit.

Where no e-way bill is required, Rule 55A asks for a tax invoice or bill of supply in the vehicle. For movements that are not supplies, the challan is the practical document to carry, and Rule 138A(5) lets the Commissioner notify the challan as the document to carry instead of the e-way bill in specified circumstances. Detention risk when the pairing fails is covered in our guide to e-way bill penalties under Section 129.

Where title and risk sit while goods travel on a challan

A challan records that no sale has happened yet, which also means ownership has not moved. That matters for insurance and loss claims as much as for tax. The US has no delivery challan, but its commercial law draws the same line for approval sales, and the contrast is useful for teams that ship in both markets.

Under the Uniform Commercial Code, Section 2-326 calls a returnable delivery a "sale on approval" when the goods are delivered mainly for the buyer's use, and a "sale or return" when they are delivered mainly for resale. Section 2-327 then allocates risk. On approval, risk of loss and title stay with the seller until acceptance, and a return after due notice is at the seller's risk and expense. On sale or return, the return is at the buyer's risk and expense.

For an Indian shipper, the practical point is that a challan-based movement leaves the goods on your balance sheet and usually under your insurance. A transit policy that covers "sales dispatches" may not cover goods with a job worker or a van salesperson unless the schedule says so. Confirm cover for each challan category before the first loss, not after it.

A worked job-work cycle in rupees, with the US tolling contrast in dollars

The numbers below follow one batch through a full job-work cycle and show what changes if part of it is never returned. All figures are illustrative; the tax rate used for the deemed supply is an assumption, and the current rate for the actual HSN should be checked, since many GST rates changed from 22 September 2025.

Scroll horizontally to see all columns.

One job-work challan from dispatch to closure, with a US toll-processing movement shown for contrast
StepIndia: Pune principal to Vapi job worker (₹)US contrast: Ohio owner to Indiana toll processor ($)
Goods sent1,200 blanks at ₹350 = ₹4,20,000 on challan PJW/26/0412; inter-State, so e-way bill required at any value1,200 blanks at $4.20 = $5,040 on a straight bill of lading and packing list; no federal tax document
Tax at dispatchNil under Section 143(1); challan value still declaredNot applicable; title and risk stay with the owner under the toll agreement
Returned after treatment1,180 good pieces on endorsed challan, valued ₹4,13,0001,180 pieces returned on the processor's bill of lading
Rejected in process20 pieces (₹7,000) sold as scrap by the registered job worker under Section 143(5)20 pieces scrapped; credit handled under the toll agreement
Open balance after reconciliation₹0 if returns plus scrap equal 1,200 pieces$0 on the owner's inventory ledger
Variant: 40 pieces never returnedDeemed supply of ₹14,000 on the original dispatch date; at an assumed 18% IGST, tax ₹2,520 plus interest, reported in GSTR-1 under Rule 45(4)40 pieces ($168) written off as shrink or claimed from the processor; no transaction-tax event created by the loss itself

The last row shows why the return clock deserves an owner. The tax on 40 missing pieces is small, but it is payable from the dispatch date, so interest runs for the whole period, and the paperwork to prove the pieces were scrapped rather than supplied gets harder every month.

Job-work challan registers that track inputs against the one-year limit in CGST Section 143(1)(a) should flag every open line at day 300, leaving 65 days to chase returns, document scrap or request an extension before Section 143(3) treats the balance as supplied on the original dispatch date.

Challan checks a system should enforce and calls a person should make

Most challan errors are mechanical and a dispatch system can block them outright. The judgement calls are fewer but more expensive: whether a movement is a supply at all, and whether goods still sitting with a third party have become one.

Scroll horizontally to see all columns.

Delivery challan tasks split between hard system blocks and work where software only helps a person decide
TaskHandled byWhy
Rejecting a challan number longer than 16 characters or reused in its seriesSystem blockFixed requirement in Rule 55(1); no judgement involved
Refusing to print when HSN, value or place of supply is blank on an inter-State challanSystem blockRequired particulars under Rule 55(1)(iv), (vi) and (viii)
Holding gate-out for an inter-State job-work challan with no e-way bill numberSystem blockRule 138(1) proviso removes the value threshold for these moves
Ageing open job-work lines and alerting at day 300 and day 1,000System calculationOne-year and three-year limits in Section 143 are date arithmetic
Reading a job worker's handwritten endorsement from a photoSoftware suggests, receiving clerk confirmsText extraction misreads quantities; the clerk counts the goods
Proposing an HSN code from the item descriptionSoftware suggests, tax team approvesClassification disputes are costly and need a named approver
Deciding whether a demo unit, loaned tool or inter-GSTIN move is a supplyTax manager decidesTurns on Schedule I and contract facts that software cannot see

Two of these blocks would have prevented the Vapi detention in the opening. The trace below shows how the same movement fails without them and what the controlled version looks like.

  1. 18:05, gate-out: challan PJW/26/0412 printed from a spreadsheet with no HSN or value; ERP movement type posted as an internal transfer, so no e-way bill prompt appears.
  2. 23:40, State border: officer finds an inter-State job-work load of about ₹4.2 lakh with no e-way bill and a challan missing two Rule 55 particulars; the vehicle is detained.
  3. Next day, 11:20: plant raises e-way bill 3412 8890 5521 after the fact and emails a corrected challan; the officer proceeds under Section 129.
  4. Controlled version, 17:50: the challan module requires HSN 7326 and value, detects consignee State 24 against consignor State 27, and refuses gate-out until Part A and Part B are complete.
  5. Controlled version, 18:10: the vehicle leaves with the challan in triplicate and the e-way bill number mapped to the challan record; the ITC-04 line is created at the same time.

Setting up a challan register that closes every open movement

A challan register is a ledger of open obligations, and it is only useful if every outbound line eventually reaches zero. Build it as a table keyed on challan number and line, with receipts, invoices and scrap entries posting against it, then query it daily.

-- Open job-work challan lines approaching the Section 143 limits
SELECT c.challan_no,
       c.line_no,
       c.goods_class,                      -- 'INPUT' or 'CAPITAL'
       c.dispatch_date,
       c.qty_sent - COALESCE(SUM(m.qty), 0) AS qty_open,
       CURRENT_DATE - c.dispatch_date      AS days_out,
       CASE c.goods_class
         WHEN 'INPUT'   THEN 365  - (CURRENT_DATE - c.dispatch_date)
         WHEN 'CAPITAL' THEN 1095 - (CURRENT_DATE - c.dispatch_date)
       END                                 AS days_left
FROM   challan_line c
LEFT JOIN challan_match m                  -- returns, onward supplies, scrap
       ON m.challan_no = c.challan_no AND m.line_no = c.line_no
WHERE  c.purpose = 'JOB_WORK'
  AND  c.excluded_tooling = FALSE          -- moulds, dies, jigs, fixtures, tools
GROUP BY c.challan_no, c.line_no, c.goods_class, c.dispatch_date, c.qty_sent
HAVING c.qty_sent - COALESCE(SUM(m.qty), 0) > 0
   AND (CURRENT_DATE - c.dispatch_date) >= CASE c.goods_class
                                               WHEN 'INPUT' THEN 300 ELSE 1000 END;

The 365 and 1,095 day figures approximate one and three years for alerting only; the legal test runs from the date of being sent out. Moulds, dies, jigs, fixtures and tools are excluded because Section 143 does not apply the return deadlines to them. Any extension granted by the Commissioner should be stored on the line so the query uses the extended date.

Ownership of the register is split, and writing it down prevents the usual standoff between stores and finance. The table below is a starting allocation that most plants adjust only slightly.

Scroll horizontally to see all columns.

Who raises, carries, closes and signs off each part of the challan trail
Record or stepRaised or held byClosed bySign-off
Challan number series and print templateERP or billing administratorNot applicableIndirect tax manager
Outbound challan and e-way bill Part ADispatch or storesReceipt, invoice or scrap entryDispatch supervisor
Duplicate copy in the vehicleTransporter or driverDelivery acknowledgementTransport coordinator
Endorsed return challanJob workerGoods receipt against the original lineReceiving supervisor
Invoices raised from approval or van stockSalesperson with invoice book or handheldDaily stock reconciliation of the loadBranch accountant
ITC-04 return and deemed-supply decisionsIndirect tax teamFiled return; GSTR-1 entry where deemedTax manager

Getting challans right is mostly configuration and habit, not new software. The rollout checklist below is ordered so that the cheapest controls go live first and the register is trustworthy before anyone relies on its alerts.

Scroll horizontally to see all columns.

Checklist for putting delivery challans under control at a plant or warehouse
ItemDone whenOwner
Map every non-invoice movement type to a Rule 55 clause or to "needs invoice"No movement type left unmapped, inter-GSTIN moves sent to invoicingIndirect tax
Fix the serial format at 16 characters or fewer per seriesERP rejects longer or duplicate numbers in testingERP administrator
Make all nine particulars mandatory on printTest print with a blank HSN failsERP administrator
Link challan to e-way bill with the job-work and value rulesInter-State job-work challan of ₹10,000 still demands an e-way billDispatch and IT
Set up return matching with endorsement capturePartial return of 1,180 of 1,200 leaves 20 open until scrap is postedStores
Schedule the ageing query and alert recipientsDay-300 alert reaches the buyer and tax teamIndirect tax
Confirm transit and third-party location insurance coverPolicy schedule names job workers and van stockFinance
Train gate staff on approval-sale and six-month limitsGate refuses an unregistered demo movementPlant administration

For how the challan's e-way bill is raised and corrected when vehicles change mid-route, see our e-way bill vehicle change workflow, which deals with the Part B update this article only touches. Where the challan sits alongside an e-invoice on mixed loads, our explainer on IRN and e-way bill sequencing covers the invoice side. More shipping and tax documentation guides sit in the logistics and supply chain library.

If you are replacing spreadsheet challans with a register tied to dispatch, receiving and the e-way bill system, and want the controls above specified as requirements, you can describe your plant and movement types in an RFP and we will map them to a build plan.

Discuss this workflow

Describe your current systems, the recurring exception and the outcome you need. Keep shipment, customer and financial records out of the initial message.

START A CONVERSATION

Let’s talk about your next build.

Prepare your brief below, then review and send it in your email app to sales@nextlabsonline.com.

SELECTED INDUSTRYLogistics & supply chain

Article: Delivery Challan Under GST Rule 55: When You Need One · Shipping & Trade Documents

THE FIRST CONVERSATION

Your product idea, AI opportunity or automation challenge—and a useful first milestone.

All fields are required.

A few sentences about the problem, your users and timing are enough.

We’ll use your details to respond to your enquiry. Please don’t include patient records, passwords or confidential information. Privacy Policy · Website Terms.

Common operational questions

Practical answers for operations, engineering, and finance teams working on delivery challan gst rule 55 in logistics & supply chain.

Can a delivery challan be used for a stock transfer between two of our branches?
Only when both branches share one GSTIN. Branches registered in different States, or separately registered in one State, are distinct persons, and Schedule I paragraph 2 of the CGST Act treats goods moving between them as a supply even without consideration. That movement needs a tax invoice and, usually, integrated tax.
Is an e-way bill required for goods moving on a delivery challan?
Usually yes. Rule 55(3) says challan movements must be declared under Rule 138. The normal trigger is consignment value above ₹50,000, but inter-State movements from a principal to a job worker need an e-way bill whatever the value. Trips up to 20 km to a weighbridge with a challan are exempt.
What happens if job-work goods are not returned within the time limit?
Section 143(3) and (4) treat inputs not returned within one year, or capital goods within three years, as supplied by the principal on the day they were first sent out. Rule 45(4) requires the principal to report that supply in GSTR-1 and pay tax with interest from that original date.
How should line sales from a delivery van be documented?
Load the van on a delivery challan for the opening stock, generate an e-way bill where Rule 138 requires one, and raise a tax invoice at each sale. CBIC Circular 10/10/2017-GST allows carrying the invoice book for this. Returned stock is received against the morning challan so the load reconciles.

References

Sources checked 13 November 2026. US and India statutory authorities and vendor documentation support platform facts; the worked examples and diagrams are original.

About the author

Vikasraj Yadav writes about operational decisions, software and automation for NextEdge Labs.